Italian windfarm

Italian windfarm

Five Vestas V90 3 MW have been installed after they were transported from the Dutch coast to central windy Italy, Benevento region. There they will start their second life to produce many more Kilowatt hours renewable energy. At the moment a team of KoppejanWind is...
Renewable power supply

Renewable power supply

When you read this post you know why the smile on the face of Site Manager Edward van den Heuvel is bigger than before 🙂 The use of electrical vehicles is increasing, also for Business in Wind. On our construction sites, often no grid connnection is available....
Wales

Wales

This week our plan and the wind were in perfect harmony! Our job was to dismantle 4 Vestas wind turbines in the beautiful area of Wales and transport them to Ireland were the turbines will start a second life. The weather conditions were perfect so all 4 dismantled...
SIMOPS

SIMOPS

Simultaneous Operations (SIMOPS) are often required for the decommissioning of Windfarms. We are almost always in these situations where communication is very important. That is why our site manager Edward van den Heuvel has the PR function (in Dutch “Praoten en...
Sweden

Sweden

A Swedish wind turbine owner decided not to replace a complete wind turbine but to repower it in another way. The top tower will be adapted and a refurbished nacelle and rotor will replace the existing other brand of wind turbine. Last week we dismantled a V80 from...