Earlier this month, our team successfully dismantled an E-53 turbine at the Astellas Ireland Company Limited Kerry Plantin Killorglin.
The Enercon turbine had been in operation since 2012 and remained in very good condition. It will be reinstalled at a new location in the future. At the same time, Enercon is preparing for the installation of a new E-82 turbine.
Thanks to everyone involved in this challenging project for the great teamwork and excellent collaboration.