Everything you need to get your used wind turbine
From inspection to installation

Sweden
A Swedish wind turbine owner decided not to replace a complete wind turbine but to repower it in...

Flevoland > Repowering Wind Farm Kubbeweg
From May 2nd Business in Wind started preparations at site for the dismantling of Kubbeweg wind...

Ascension Island
Six wind turbines have been dismantled and prepared for recycling on Ascension Island. This is an...

Benevento, Italy
The pictures show the installation of Vestas V90 3MW wind turbines, which we decommissioned last...

Wales
In beautiful sunny Wales we dismantled last week an old Lagerwey LW50/750 wind turbine. After 15...

Refurbishment
In these weeks 4 x V80 2MW are being refurbished to extend the lifetime with another 20 years. In...

Flying tools, Ascension Island
Dismantling of wind turbines always requires a serious and thorough preperation. For the six on an...

Alaska Wind Farm, Dorset
After carefully dismantling four Vestas V80 wind turbines in Lommel Belgium, the towers are...

Ascension Island
A Boeing C-17 from the US Air Force dropped Wim Robbertsen last week on Ascension Island to...

New year, new projects
2022 started with dismantling 4 Vestas V80 turbines from the Vuursteentocht wind farm in the...

Wales
While the sheep graze in their place around the turbines, the turbines themselves are entering...

Lommel, Belgium
This week we had perfect weather conditions to start dismantling 8 Vestas V80 turbines at Windpark...

RTL Op de zaak
Sunday 31th of October (12.00 – 12.30) we will show up in the Dutch television program ‘Op de...

Route survey in Scotland
Performing a route survey through beautiful Scotland in preparation for the installation of used...

From Belgium to the UK
Preparations for dismantling 8 Vestas V80 turbines at Kristalpark in Lommel have been started. 4...

Windpowernl Magazine
Windpowernl recently released a new edition of their magazine. We had the opportunity to tell more...

Restoring the site
Restoring the site usually means removing the foundation, windfarm cabling and substation. This...

As soon as possible
“Are you able to take down the turbine as soon as possible?” No problem, within one week...

Inching and pinching
Along the Bloesemlaan you will find several Vestas V52 wind turbines on one-piece towers of 36...

Foundation removal
Part of our work is the extraction of the foundation insert and the removal of the concrete...
Products
A selection of our best green deals
Wind turbines
reliable used wind turbines
Wind turbine parts
A great number of different parts for wind turbines